Mr Edward Chong – CEO of IJM Land,supervising the raising of the lift/stair core.
Refurbishment and lining of viaduct arches.
View of the rebar installation – first floor lift/stair core.
South side – first steels delivered.
Very first jack of the lift/stair core Block D.
Slab poured.
Core D.
South side.
Preparation works for final concrete slab.