Completion of Blocks B and C (Rosemary and Lavender) is currently estimated for October and Block D (Sage) in December

 

*** Please find links below for tax advice for non-UK residents produced by Cripps Pemberton Greenish ***

  1. Non-UK-residents_Sale-of-UK-residential-property_April-2019.pdf
  2. Islamic-finance_April-2019.pdf
  3. Tax-for-non-UK-resident-individuals-and-companies_UK-residential-propert….pdf
  4. Advice-for-people-living-outside-the-UK_Property-in-corporate-ownership_….pdf
  5. Advice-for-people-living-outside-the-UK_Personal-ownership_April-2019.pdf

*** Please find link below for a list of service providers***

  1. List of Service Providers : mortgages – letting agents – sale agents – furniture supply – management services.

 

One of the banks of electric switchgear delivered and installed.

 

 

 

 

 

 

 

Sprinkler water tanks being installed.

 

 

 

 

 

 

 

Reception chandelier – Completely handmade by a long standing family run artisan business in Italy, the 1970’s style Molecule statement chandelier comes with 93 hand blown bespoke Murano glass spheres. It’s nearly 4 metres high x 4 metres wide. It weighs in at around 120 kilograms.

 

 

 

 

 

 

 

 

 

 

The street hoarding to the front of new Chinese Embassy has been removed to reveal the splendid listed building within the grounds.

 

 

 

 

 

Kitchen Installation.

 

 

 

 

 

 

 

Link Block between B and C. 

 

 

 

 

 

 

 

Installation of the first balconies Block C facing Royal Mint Street.

 

 

 

 

 

 

 

 

One of the roof parapets being made water tight. 

 

 

 

 

 

 

 


 

 

 

 

 

 

 

Cladding panels loaded onto the communal garden area between Blocks C and D – due to be fitted over next couple of days.

 

 

 

 

 

 

Pre-cast lift overrun on top floor, Block D.

 

 

 

 

 

 

 

Top floor cladding Block B installed.

 

 

 

 

 

 

 

 

Northern elevation of Block D as viewed from Magdalene Passage, E1.

 

 

 

 

 

 

 

 

View from the eastern side of Royal Mint Street looking west.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1st floor link between Blocks C and D – runs parallel to the swimming pool area and communal gardens.

 

 

 

 

 

 

Northern elevation.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

First flooring installation.

 

 

 

 

 

 

 

First balconies on link between B and C.

 

 

 

 

 

 

 

Link between C and D.

 

 

 

 

 

 

 

Block C cladding progress.

 

 

 

 

 

 

 

 

Bathroom components.

 

 

 

 

 

 

 

 

Marble sample for bathroom.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Plastering apartments.