(Completion currently estimated for September/October 2019)

 

Second floor pre-cast train impact walls now being installed. In the next few weeks, the external shape of the building will become more apparent including the 1st floor communal garden areas.

We are delighted to announce that IJM have secured a deal with Community Fibre to provide apartment owners within Royal Mint Gardens the following;

Experience the fastest internet in the UK, all ready for you to use from the day you move in and free during the first 6 months.

Community Fibre Gigafast’s package gives you an average download and upload speed of 920 Mbps, be ready to experience a new dimension in internet connectivity.

After the initial 6 months, you may choose to stay with Gigafast (£50 p/month), Ultrafast with symmetric speeds of 200 Mbps (£35 p/month) or the Basic package with symmetric speeds of 40 Mbps.

For more information on our products please visit www.communityfibre.co.uk  or contact us 24/7 on hello@communityfibre.co.uk or 0800 082 0770

Block D, 2nd floor pre-cast planking installed.

Decking installed for the mezzanine level of the town houses fronting Royal Mint Street. Concrete pour will take place shortly so that the southern frontage of the building catches up with the other northern sections.

Part of the second floor is already poured – this image shows the operatives setting out more of the second floor.

2nd floor, block B, prep work for concrete slab pour.

Train impact pre-cast concrete walls now fully installed at 1st floor level.

Air conditioning to arches.

2nd floor Block D steels.

Impact walls and swimming pool frame.

Impact walls.

Cinema room – installation of double block work and sound proofing.