July 2018

Pre-cast train impact walls being laid out for installation on the northern side of the building. This initial test run will take place during engineering hours (night works – no trains). If the installation goes smoothly, the intention is the install the remainder of the walls whilst the rail lines are live/in operation.

Second floor (above encapsulation) being prepared for slab pour.

Back of house link to Network Rail arches coming together, extra wide passageway and high ceilings. On the left of the image is the lower level that will house much of the plant equipment.