February 2018

(Completion currently estimated for September/October 2019)

 

Preparation works for a large concrete pour on the northern side.

Core D prepared for slip forming rig.

The last of the reduced level dig on the northern side. Rebar fixing taking place and prep works for core C.

South side insulation works.

The start of the stairwell core for Block D.

North side, ground works progressing. Concrete poured in sections, rebar fixed and set in stages.

First crane installed and commissioned.

Arch screed being laid.