January 2018

(Completion currently estimated for September/October 2019)

 

Levels being checked.

Good progress with the ground works on the northern section of the site.

Concluding ground works around Block D lift and stair cores.

Floor slab facing Royal Mint Street – Extending towards Mansell St.

Julie Houghton, Head of Asset Protection for Network Rail Anglia Route, carrying out site visit.

Reduced level dig on the northern side continues to make good progress.

Steel supports imbedded into the new concrete base – in place for the slip forming of core D – the most eastern block.

Steel cages being installed within reduced level dig area.

Recently installed piles exposed, to be cropped as part of the foundation works.

Floor slab of the town houses being extended along the southern side of the site.

Removal of soil from within the new attenuation tank.

 

Ground works directly in front of recently cleared arches.

Foundation works on the southern side.

Slip form frame being assembled and tested.