Spoil from the north side piling works being removed. Access in and out of the site is extremely restricted due to the limited width available.

?

South side piling works. We are piling within ½ a metre of the DLR tunnel so the level of movement monitoring is significantly intensified

?

Extension of the capping beam and cutting back of the existing sheet piling, being extended past the Royal Mint Gardens site to enable total enclosure of the DLR line and the ultimate delivery of Phase 2

?

Piling rigs operating on both sides of the site

?

Various piling rigs working on the south side of the site – piling for the superstructure and the bases for the tower cranes